![]()
![]()
The hydraulic down-the-hole (DTH) drilling rig for mining offers distinct advantages, including superior power transmission and precise control over drilling parameters. Its hydraulic system provides higher torque and penetration rates, ensuring efficient operation even in challenging rock conditions. The rig delivers smoother, quieter performance with reduced vibration, which enhances operator comfort and equipment longevity. Additionally, the hydraulic design eliminates the need for compressed air in the hammer mechanism, lowering energy consumption and environmental impact. With improved reliability, easier maintenance, and better adaptability to various terrains, the hydraulic DTH drilling rig significantly boosts productivity while reducing overall operational costs.
The drilling rig is characterized by excellent integrity and compact design structure. Optional installation of automatic rod change,configuration dry dust collectors environmental protection.
High degree of automation, efficient drilling, simple operation, flexible maneuverability,single operator for labor cost.
Sanrock automatic drilling rig with rod changing system, powerful feeding and rotation design for less jamming in complex rock situation,hefficient High efficiency drilling speed.
Can easily cope with all kinds of drilling angel requirement of landscapes.
The advantageous functions such as precise boom positioning,automatic rod handling.
![]()
![]()
![]()
![]()
![]()
![]()
At urban construction project, surface mining, quarries ,construction work sites,foundation pit construction, road slope protection project etc.
![]()
![]()
![]()
1.Do you provide design drawing and customization services for complete machines and drilling tools?
Please provide your technical specifications or project background details, and we are ready to develop a customized proposal based on your requirements.
This includes 2D and 3D design drawings , delivered in various formats including DWG, PDF, STEP, and IGES.
Our engineering team specializes in developing tailored solutions that meet your specific operational requirements, geological conditions, and performance objectives.
2.How can I place the order?
Sign the PI,pay deposit,we will arrange the production. After finished production pay balance. Finally we will ship the goods.
3.How is the shipment? How long dose it take?
For large quantity or heavy products, we ship by sea shipping or land shipping. Shipping efficiency depends on country and city you want to ship to. For small and delicate products, we ship by DHL, UPS, Fedex or TNT. You can also appoint shipping method you like before we ship.
4.How is your quality control?
We have our own experienced QC. There will be strict inspection and testing for every order before shipping out.
Our comprehensive inspection service goes beyond basic checks. We analyze performance,and provide a detailed report to maximize your uptime, reduce operating costs, and extend the lifespan of your equipment.