DTH Drill Rig Container Loading Process
The down-the-hole (DTH) drill rig is carefully loaded into standardized shipping containers to ensure safe and efficient transportation. Prior to loading, the rig undergoes thorough inspection and partial disassembly (if required) to optimize space utilization and prevent damage. Key components, including the hydraulic power unit, drill pipe modules, and mast assembly, are securely fastened using heavy-duty straps and shock-absorbent materials to minimize movement during transit. Critical surfaces are treated with anti-corrosion agents, and moisture-resistant packaging is applied to safeguard against environmental hazards. Detailed packing lists, assembly guidelines, and safety certifications are enclosed within waterproof documentation pouches.